In tunnelling in soil mass, in groundwater existing mode, liquefaction, elastic displacements and settlement in soils upon the tunnel, are the risks may attack the excavated underground space stability. In this case study that were performed on second line of Mashhad city subway route, information catched from Standard Penetration Test, in situ and laboratorial tests, were used to optimum numerical values search for soil engineering parameters that could optimize the TBM stationing level. In order to this goal attaining, intelligent, numerical and probabilistic methods were used and the reliability of intelligent and numerical methods with the Safety Factors of tunnel stability, investigated simultaneously. The results were denoting the accordance of intelligent models such as Genetic Algorithm (GA) and Multi objective Genetic Algorithm with Finite Element model's output. So these models could be complement of each others in planning and designing of tunnels and using of them advised in tunneling and excavations.
Rights and permissions | |
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License. |