rezaian S, jozi S A, ataee S. Assessing Environmental Risk Caused by Zanjan’s Paverood Dam in its Construction Stage Using a combination of TOPSIS and RAM-D Methods. Journal of Engineering Geology 2016; 10 (2) :3445-3464
URL: http://jeg.khu.ac.ir/article-1-2328-en.html
1- دانشیار گروه محیط زیست، دانشکده فنی و مهندسی،دانشگاه آزاد اسلامی واحد تهران شمال , s_rezaian@yahoo.com
2- Assistant Professor, Department of Environment, Faculty of Science, Islamic Azad University, Shahrood Branch, Iran
3- M.Sc. of Environmental Assessment, Islamic Azad University, science and Research Branch, Tehran, Iran
Abstract:   (7494 Views)

Objective of the present research is to identify, analyze, and assess risk of Paveroud Dam during construction phase. Following collection and analysis of the information related to environmental conditions of the area of study and technical specifications of dam construction, a list of probable risk factors was prepared in the form of a questionnaire, and for verification, the questionnaires were provided to a group of specialists consisting of elites and professors specialized at the disciplines relevant to environment and civil engineering. Number of questionnaires was determined based on Cochran’s formula. In the first step, the expert group in the research was asked to score in Likert scale format so as to analyze the acquired responses and the risks present in the region. Having analyzed the scores using the findings of PHA method, TOPSIS technique was applied to prioritize the identified risks of Paveroud Dam. The results indicated that erosion had the highest priority among 36 risk factors. After prioritization among the risk factors, risk was also assessed using RAM-D technique in which “impact on Sorkhabad Protected Zone with 9 scores, “erosion” with 6 scores, and “work at high elevation” with 3 scores were recognized as three major risks of Paveroud Dam. In order to mitigate the effects of dam risks during construction phase, environmental management planning is crucial, and for this purpose, risk mitigation choices were recommended at the end aimed at coping with the identified risks.

Full-Text [PDF 532 kb]   (4106 Downloads)    
Type of Study: Case-Study | Subject: En. Ecosystem
Accepted: 2016/06/8 | Published: 2016/06/8

Add your comments about this article : Your username or Email:
CAPTCHA

Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

© 2024 CC BY-NC 4.0 | Journal of Engineering Geology

Designed & Developed by : Yektaweb